AdriSuite
synced 05:51 PM
Deliverables
AdriPlan
AdriCad: SouthAdriBim: Urban infill residential · 1F · 108.3×65.6 ft
Command Center

Project controls without leaving the design loop.

AdriPlan turns model decisions from AdriCad and AdriBim into budgets, schedules, permits, procurement, RFIs, and funding milestones.
01
BIM TakeoffModel quantities and utility points seed the estimate.
02
EstimateTrade line items establish the live cost plan.
03
BiddingPackages inherit allowances from the estimate.
04
BuyoutAwarded bids become contract commitments.
05
InvoicingPay apps bill against the committed contract value.
Projected Cost from BIM
$9.59M
Estimate feeds bidding and invoicing
Gross Area from BIM
42,627 sf
1 floors · 108.3×65.6 ft · BIM
Open RFIs
12
4 need response this week
Funding Gate
72%
Ready for lender package

Cost Plan

Live estimate
DivisionStatusBudgetForecastUse
SiteworkPricing$410K$436K
Shell & StructureCoordinated$1.26M$1.22M
MEP SystemsBIM active$930K$984K
InteriorsDesign set$820K$795K
Soft CostsLegal review$690K$745K

Schedule Health

Baseline v3
Design lock
May 8
82%
Permit filing
May 20
54%
Long-lead buyout
Jun 3
31%
Construction
Jul 14
12%
Closeout
Feb 6
4%
Construction Time

Critical path and construction sequence.

Floor-by-floor construction phases with type tagging, durations, and 4D bridge export for AdriSnap.

Construction sequence

Preconstruction Structure MEP rough-in Envelope Finishes Closeout
Phase Type Start Finish Wks Status Gantt bar
Permits & Legal

Approvals, jurisdiction notes, and required documents.

RequirementOwnerStatusDue
Zoning compliance memoPlannerIn reviewMay 3
Building permit setArchitectDraftingMay 20
Fire department reviewMEPNeeds RFIMay 12
Utility service lettersOwnerRequestedMay 18
Insurance certificatesLegalReadyApr 30
Materials

Long-lead items and material lists.

Use AdriBim quantities and AdriCad finishes to build a procurement register.
PackageLead TimeStatusAllowance
BIM · AC Unit (72 ea)4 weeksFixtures / Utility Points$202K
BIM · Dishwasher (18 ea)4 weeksFixtures / Utility Points$16K
BIM · Elevator (3 ea)6 weeksCore$555K
BIM · HVAC Diffuser (108 ea)4 weeksFixtures / Utility Points$26K
BIM · Kitchen Sink (18 ea)4 weeksFixtures / Utility Points$17K
BIM · Elec Panel (18 ea)4 weeksFixtures / Utility Points$76K
BIM · Sconce (126 ea)4 weeksFixtures / Utility Points$23K
BIM · Shower (36 ea)4 weeksFixtures / Utility Points$65K
BIM · Lav Sink (36 ea)4 weeksFixtures / Utility Points$23K
BIM · Spotlight (306 ea)4 weeksFixtures / Utility Points$29K
BIM · Sprinkler Head (270 ea)4 weeksFixtures / Utility Points$39K
BIM · Stair (3 ea)6 weeksCore$195K
BIM · Toilet (36 ea)4 weeksFixtures / Utility Points$31K
BIM · Tub (36 ea)4 weeksFixtures / Utility Points$79K
BIM · Washer (18 ea)4 weeksFixtures / Utility Points$20K
BIM · Gravity Drain / Waste route length (5648.1 lf)6 weeksPipe / Conduit$260K
BIM · HVAC Supply Duct route length (5601.7 lf)6 weeksDuctwork$403K
BIM · Fire Sprinkler Piping route length (9610.5 lf)6 weeksPipe / Conduit$365K
BIM · Domestic Water Supply route length (5648.1 lf)6 weeksPipe / Conduit$192K
BIM · Electrical Conduit route length (17274.1 lf)6 weeksPipe / Conduit$415K
Elevator22 weeksSpec pending$185K
Electrical gear18 weeksQuote requested$142K
Windows14 weeksAlternate B$318K
HVAC equipment12 weeksBIM sizing$226K
Finish flooring8 weeksDesign selected$94K
Documentation

Drawings, permits, contracts, RFIs, meetings, and approvals.

Use this as the project room for uploaded files, issued sets, decision records, and closeout packages.

Permit drawing set - schematic coordination

Drawing Set · Architect
In review · 2026-04-29
In review

MEP shaft coordination snapshot

RFI Attachment · MEP
Issued · 2026-04-28
Issued

Owner-CM preconstruction agreement

Contract · Legal
Draft · 2026-04-25
Draft

Utility service letter request package

Permit · Owner
In review · 2026-04-23
In review
Questions

RFIs, decisions, and scope gaps.

IDQuestionImpactStatus
RFI-014Confirm stair pressurization approachHighOpen
RFI-013Can facade alternate B keep the approved rhythm?SavingsReview
RFI-012Coordinate wet shaft with kitchen stackMediumAnswered
RFI-011Confirm utility meter room clearanceMediumOpen
Meetings

Log, action items, and decisions.

OAC Weekly #12 · Apr 22Reviewed permit timeline. MEP/FP coordination milestone pushed to May 5. Action: Architect to confirm shaft dimensions before AHJ meeting.
Lender review call · Apr 18Lender requesting updated estimate before May 1. Budget model shared. Contingency confirmed at 10%. Action: Lock hard costs by Apr 30.
Design review · Apr 10Facade alternate B approved. Window procurement lead time confirmed 14 weeks. Action: Issue NTO to window vendor this week.
Capital

Funding milestones and draw readiness.

Connect design maturity, permit progress, schedule milestones, and cost exposure to lender gates.
Equity Committed
$1.35M
92% complete
Debt Package
Draft
Needs final estimate
Next Draw
$420K
After permit issue
Exposure
$186K
Open alternates
Detailed Estimate

Trade-level cost breakdown.

CSI divisions with line items — structural, MEP, finish, and soft costs. Edit quantities and rates to update totals live.
↳ AdriBim MEP Signal
Fixtures: 720 · Sprinklers: 270 · Utility points: 1410
Pipe: 20,907 ft · Duct: 5,602 ft · Takeoff: $3.03M
⬡ 24 geometry-driven  ·  ◈ 6 BIM-driven  ·  61% of estimate is live
⬟ Construction method: Precast Concrete
⚠ BIM Data Review
1 item flagged — check the estimate rows marked BIM below.
Plumbing fixtures BIM: 198 ea Expected: 9–36 ea HIGH Capped at 40 ea in estimate
Sanitary piping BIM: 11,296.2 lf Expected: 1,705–7,673 lf OK Within expected range
HVAC ductwork BIM: 11,311.4 lf Expected: 12,788–106,567 lf OK Within expected range
Electrical conduit BIM: 17,274.1 lf Expected: 12,788–127,881 lf OK Within expected range
Sprinkler heads BIM: 270 hd Expected: 213–609 hd OK Within expected range
Construction Method Precast Concrete · Stone cladding
Market / Location ×1.00 · National avg Applied to hard cost subtotal before GC fee & contingency
Display Currency
Showing US dollar values
Area Gross area: 42,627 sf  ·  Cost/sf: $225/sf
Description Unit Quantity Unit Rate Total Status
02 — Sitework & Demolition $108K
03 — Concrete Structure $106K
05 — Structural Steel $344K
06 — Wood Framing $33K
07 — Envelope & Insulation $256K
08 — Openings $213K
09 — Finishes $1.14M
15 — Plumbing & Fire Protection $1.07M
15M — Mechanical (HVAC) $1.29M
16 — Electrical $1.30M
01 — General Conditions & GC Fee $2.30M
Soft Costs — Design, Legal & Permits $1.43M
Hard Costs Only$7.68M Total incl. Soft & Contingency$9.59M
DivisionTotal$/sf% of Total
02 — Sitework & Demolition$108K $3 1%
03 — Concrete Structure$106K $2 1%
05 — Structural Steel$344K $8 4%
06 — Wood Framing$33K $1 0%
07 — Envelope & Insulation$256K $6 3%
08 — Openings$213K $5 2%
09 — Finishes$1.14M $27 12%
15 — Plumbing & Fire Protection$1.07M $25 11%
15M — Mechanical (HVAC)$1.29M $30 13%
16 — Electrical$1.30M $31 14%
01 — General Conditions & GC Fee$2.30M $54 24%
Soft Costs — Design, Legal & Permits$1.43M $34 15%
Total $9.59M$225 100%

Bid Alternates

Alt #DescriptionTrade Add / DeductStatus
ALT-01Facade alternate B — brick vs panelEnvelope ($42K) Accepted
ALT-02HVAC combine equipment procurementMechanical ($31K) Pending
אומדן עלויות — ישראל

Israeli cost estimate. ⚡ Market-adjusted rates

Quantities derived from the project database — rooms, fixtures, pipes. Rates from לשכת שמאי המקרקעין June 2025 benchmark, adjusted for current market conditions. Toggle between ₪ and $ using the live exchange rate.
Building ID:
Press Run Takeoff to generate quantities from the project database and apply Israeli market rates.
Bid Management

Packages, subcontractors, and bid leveling.

One package per trade. Expand to compare bids side by side, identify the low, and award.

New Bid Package

Mechanical — HVAC
3 bids  ·  Due 05-28  ·  3 subs
Budget $1.29M
Bidding
Northeast HVAC
Equipment supply $82K
Labor & install $64K
Misc & overhead $72K
Total $218K
Blue Ridge Mech
Equipment supply $88K
Labor & install $67K
Misc & overhead $76K
Total $231K
CityAir Systems  LOW BID
Equipment supply $79K
Labor & install $60K
Misc & overhead $71K
Total $210K
Electrical
3 bids  ·  Due 06-03  ·  4 subs
Budget $1.30M
Evaluating
Apex Electric
Equipment supply $142K
Labor & install $86K
Misc & overhead $70K
Total $298K
Volta Group
Equipment supply $148K
Labor & install $90K
Misc & overhead $77K
Total $315K
Metro Elec.  LOW BID
Equipment supply $138K
Labor & install $82K
Misc & overhead $67K
Total $287K
Plumbing & Fire Protection
0 bids  ·  Due 06-10  ·  3 subs
Budget $1.07M
Invited

No bids received yet.

Masonry & Facade
0 bids  ·  Due 06-17  ·  5 subs
Budget $469K
Invited

No bids received yet.

Pay Applications

Progress billing and draw schedule.

AIA G702-style pay applications. Track scheduled value, percent complete, stored materials, retainage, and net due per billing period.
Contract Value
$2.49M
Billed to Date
$995K
Retainage Held
$111K
Balance to Finish
$1.49M

Draw Schedule

Active
App #Period End% Done EarnedRetainage Net DueStatus
G702-1 2026-03-31 4% $100K $10K $90K Paid
G702-2 2026-04-30 11% $416K $42K $374K Approved
G702-3 2026-05-31 18% $590K $59K $531K Pending

New Pay Application

Draw Readiness

Lien waivers received2 of 4
G703 continuation sheetsReady
Inspector sign-offPending
Next draw request$531K pending
Retainage release trigger50% complete
Risk Register

Track cost, time, legal, and documentation exposure.

Risks can be tied back to RFIs, permit comments, material lead times, and unresolved model coordination.
Fire review comments may require larger pressurization shaftHigh
Elevator lead time threatens dry-in milestoneMedium
Legal agreement needs insurance exhibit before lender packageMedium
Permit drawing set missing final accessibility sheetHigh
AdriSuite
AdriSuite

AdriPlan Outputs

Project

Generate AdriPlan files here, then review, issue and download the full project set from the AdriCad Deliverables Hub.

Centralized deliverables: this app writes into the shared project file room. Use AdriCad as the canonical hub for the complete set.
Total
deliverables
Ready
to download
Issued
this project
Drafts
in progress
AdriSnap

Generate & Export

Live from AdriPlan data
Full Project Package — PDF
Complete report: KPIs, cost estimate (all CSI divisions), schedule, procurement, RFI log, risk register, documents, and meeting notes — in one formatted A4 document.
PDF · A4 · All sections · AdriPlan data
Full Project Package — Excel
All data in one workbook across 13 sheets: Cover, Cost Summary, Estimate, Procurement, Schedule, Cash Flow, Permits, RFIs, Documents, Risk Register, Action Register, Meetings, and BIM Takeoff.
Excel · 13 sheets · Complete · AdriPlan data
AdriSuite

AI Cost Check

BENCHMARKING · FLAGS · MARKET RATES · METHOD REVIEW

Hit Check Estimate to benchmark against Israeli market rates — or type a specific question above.
v51 · GitHub